Zimbabweans speak out about poor service delivery [1]: “I’m very much worried about the so called ZESA load shedding especially in the area I live, Hatfield. Usually the cutoff is at 5.30pm and will be back at around 10pm and will also be off as early as 4.30am.”
Zimbabwe: We are tired of poor service delivery
· Written by Ndesanjo Macha
Categories: Sub-Saharan Africa, Zimbabwe, Development